Lee County Utilities Green Meadows WTP Control and SCADA system

Design and system integration for completely new RO/Ion Exchange water treatment facility.

BCI provided the design and system integration for completely new RO/Ion Exchange water treatment facility. Control panels, PLC programming, instrumentation and installation of equipment was provided by BCI.

Project was under budget and on schedule, bringing approximately $1.5 million back to Lee County.
Treatment Capacity increased from 9 million gallons per day (MGD) to 14 MGD of potable drinking water.

o Reverse Osmosis treatment production: 7.5 MGD
o Ion Exchange treatment production: 3.9 MGD
o Sandstone Aquifer blend production: 4.6 MGD
o 33 raw production wells with depths ranging from 40 feet to 870 feet

Included Vendors

Lee County Utilities Green Meadows WTP Control and SCADA system

Project Gallery

Oficina Corporativa de BCI Technologies

1619 E. Vine St.
Kissimmee, Florida 34744

Teléfono: (407) - 847 - 8848
Fax. (407) - 847 - 8824

Correo electrónico: Sales@bcitech.com

  • LinkedIn
  • YouTube
  • Facebook

© 2022 Blackburn Controls, Inc.  

Tecnologías DBA BCI

Oficina de Ingeniería de BCI Technologies

13891 Jetport Loop Suite 14
Fort Myers, Florida 33913

Teléfono:  (239) - 433 - 9600
Fax: (239) - 433 - 2700

Correo electrónico: Estimators@bcitech.com

bottom of page